Air Miles Calculator

Distance between Victoria River Downs (VCD) and OZ Minerals Prominent Hill Mine (PXH)

Flight distance from Victoria River Downs to OZ Minerals Prominent Hill Mine (Victoria River Downs Airport – Prominent Hill Airport) is 960 miles / 1545 kilometers / 834 nautical miles. Estimated flight time is 2 hours 19 minutes.

Driving distance from Victoria River Downs (VCD) to OZ Minerals Prominent Hill Mine (PXH) is 1225 miles / 1971 kilometers and travel time by car is about 24 hours 21 minutes.

Map of flight path and driving directions from Victoria River Downs to OZ Minerals Prominent Hill Mine.

Shortest flight path between Victoria River Downs Airport (VCD) and Prominent Hill Airport (PXH).

How far is OZ Minerals Prominent Hill Mine from Victoria River Downs?

There are several ways to calculate distances between Victoria River Downs and OZ Minerals Prominent Hill Mine. Here are two common methods:

Vincenty's formula (applied above)
  • 960.036 miles
  • 1545.028 kilometers
  • 834.248 nautical miles

Vincenty's formula calculates the distance between latitude/longitude points on the earth’s surface, using an ellipsoidal model of the earth.

Haversine formula
  • 963.424 miles
  • 1550.481 kilometers
  • 837.193 nautical miles

The haversine formula calculates the distance between latitude/longitude points assuming a spherical earth (great-circle distance – the shortest distance between two points).

Airport information


A Victoria River Downs Airport
City: Victoria River Downs
Country: Australia Flag of Australia
IATA Code: VCD
ICAO Code: YVRD
Coordinates: 16°24′7″S, 131°0′17″E

B Prominent Hill Airport
City: OZ Minerals Prominent Hill Mine
Country: Australia Flag of Australia
IATA Code: PXH
ICAO Code: YPMH
Coordinates: 29°42′57″S, 135°31′27″E

Time difference and current local times

The time difference between Victoria River Downs and OZ Minerals Prominent Hill Mine is 1 hour. OZ Minerals Prominent Hill Mine is 1 hour ahead of Victoria River Downs.

Time Difference

Victoria River Downs

 ACST

OZ Minerals Prominent Hill Mine

 ACDT

Carbon dioxide emissions

Estimated CO2 emissions per passenger is 148 kg (326 pounds).

Frequent Flyer Miles Calculator

Victoria River Downs (VCD) → OZ Minerals Prominent Hill Mine (PXH).

Distance:
960
Elite level bonus:
0
Booking class bonus:
0

In total

Total frequent flyer miles:
960

Round trip?